description: "*(State-wise implementation progress and stakeholder feedback, 2024-2025)* India's PM E-DRIVE is the flagship nationwide push anchoring EV adoption after FAME-II. Unlike earlier, primarily demand-side phases, PM E-DRIVE couples incentives with **charging build-out, public-transport OPEX support, commercial-vehicle electrification, and upgrades to…"
url: "https://diyguru.org/guide/pm-e-drive-scheme-electric-mobility-drive-deep-dive/"
updated: "2026-02-26"
category: 10. National EV Policy Framework
---

# PM E-DRIVE Scheme (Electric Mobility Drive) — Deep Dive

*(State-wise implementation progress and stakeholder feedback, 2024-2025)*

India's PM E-DRIVE is the flagship nationwide push anchoring EV adoption after FAME-II. Unlike earlier, primarily demand-side phases, PM E-DRIVE couples incentives with **charging build-out, public-transport OPEX support, commercial-vehicle electrification, and upgrades to testing & R&D capacity**. In 2025, it is the reference program against which states are aligning their policies, tenders, and city mobility plans.

## **10.2.1 What the scheme covers--and how it is implemented**

**Scope & tenure.** Launched in late 2024 with a ₹10,900-crore outlay and subsequently extended to March 2028 within the same envelope, PM E-DRIVE supports:

- **Vehicles:** e-2W, e-3W, e-LCVs, **e-trucks**, **e-ambulances**; grants dovetailed with **PM-eBus Sewa** for city buses.
- **Charging:** capital grants for public/semi-public charging stations (PCS), battery swapping, corridor nodes, and **depot power upgrades**.
- **Standards & labs:** modernisation of ARAI/ICAT/GARC for EV battery safety, cybersecurity, and high-voltage testing.

**Design principles.**

- **Continuity without cliff-edges:** replaces the short bridge program for 2W/3W and broadens to heavy and essential vehicles.
- **System approach for buses:** unit purchase subsidies give way to **per-km OPEX support** (under PM-eBus Sewa) + depot and behind-the-meter power infra.
- **Localisation pull-through:** eligibility tiers link to **phased domestic value addition** (cells, packs, motors, inverters, BMS), complementing PLI-ACC and automotive PLI.
- **Interoperability:** adherence to Bharat charging standards with CCS flexibility; incentives also recognise **battery swapping** for last-mile logistics.

**2025 near-term milestones.**

- **Charging:** ramp toward ~72,000 public chargers supported by PM E-DRIVE in the 2024-28 window, aligned with highways and urban hot-spots; states add their own viability-gap funding (VGF) on top.
- **Buses:** PM-eBus Sewa sanctions scale up--thousands of e-buses already approved across multiple states/UTs--with parallel approvals for **depots, chargers, and power augmentation**.
- **Commercial vehicles:** new incentive formulas for **e-trucks (by kWh and GVW)** and **e-ambulances** kickstart fleet pilots in logistics and health systems.

## **State-wise rollout snapshots (2024-2025)**

The picture below aggregates what changed on the ground under PM E-DRIVE and aligned state programs. (Figures are rounded where appropriate; where counts vary by source during 2025, ranges or "~" are used to reflect orders of magnitude rather than point estimates.)

### **Maharashtra**

- **Policy & instruments:** New **EV Policy 2025** (valid till 2030) with *VGF up to 15% capex* for DC fast chargers; **highway spacing target ≈ 25 km** for fast chargers; mandatory chargers at MSRTC bus stations and selected fuel stations subject to feasibility.
- **Progress snapshot:** Among the highest e-bus sanctions under PM-eBus Sewa; corridors around Mumbai-Pune-Nashik see densifying PCS; multiple OEM/Tier-1 footprints in Pune-Chakan, Aurangabad.
- **Near-term focus (2025-27):** Aggressive **CPO onboarding** under VGF, depot electrification for STUs, and renewable-linked charging pilots.

### **Delhi (NCT)**

- **Policy & instruments:** **EV Policy 2.0 (revamp)** targets **>13,000 public chargers by 2030** and dense 1 km × 1 km coverage; e-buses targeted at ~3,000 by end-2025.
- **Progress snapshot:** **4,600+ charging points** and ~250 swapping points already operational across dozens of locations; e-bus fleet steadily rising under OPEX model.
- **Near-term focus:** Ward-level charger density, depot augmentation, and parking/land policy harmonisation for swapping hubs.

### **Karnataka**

- **Policy & instruments:** State EV policy with BESCOM as nodal utility; mix of PPP and utility-capex models.
- **Progress snapshot:** **~5,800 public chargers** reported operational (majority in Bengaluru); however, **PPP tenders** for 2,500 chargers faced tepid response outside Bengaluru; state pivoting to **utility-led capex (initial 100 stations)** and better land allocation.
- **Near-term focus:** Expand beyond Bengaluru into Tier-2/3 highways; improve site access and demand-charge frameworks.

### **Tamil Nadu**

- **Policy & instruments:** **TN EV Policy 2023**; six "EV Cities" mission (Chennai, Coimbatore, Tiruchirappalli, Madurai, Salem, Tirunelveli); robust **manufacturing cluster** (Hyundai, Ola, Ather, suppliers).
- **Progress snapshot:** Rapid depot electrification for metropolitan transport corporations; new OEM capacity additions; city charging PPPs scaling.
- **Near-term focus:** City-cluster charging grids, e-bus depot upgrades, export-oriented component localisation.

### **Gujarat**

- **Policy & instruments:** EV Policy 2021; **Green Energy Corridor-III (≈ ₹29,000 cr)** to move more renewable power, indirectly easing large PCS and depot connections.
- **Progress snapshot:** **Rooftop-solar leadership** aids green charging pilots; city-level policies like **Surat Green Vehicle Policy 2025** target 50% EV sales by 2030.
- **Near-term focus:** Renewable-linked highway charging, battery-materials logistics, and industrial park charging norms.

### **Uttar Pradesh**

- **Policy & instruments:** Revised policy **includes upstream grid costs** in PCS subsidies--reducing a key barrier for CPOs; plan to install **~320 PCS across 16 cities**.
- **Progress snapshot:** Strong e-3W adoption; Lucknow-Kanpur-Noida corridors earmarked for public charging and e-bus depot augmentation.
- **Near-term focus:** Urban PCS density, distribution-grid upgrades, and peri-urban e-LCV charging.

### **Telangana**

- **Policy & instruments:** **EV & Energy Storage Policy** with **100% road-tax and registration waivers** for broad EV categories; dedicated battery/ESS thrust.
- **Progress snapshot:** Surge in registrations since late 2024; Hyderabad-ORR logistics hubs piloting swapping plus DC fast charging.
- **Near-term focus:** Co-locating charging with **industrial/logistics parks**, utility-CPO SLAs for uptime guarantees.

### **Rajasthan**

- **Policy & instruments:** State support aligned with PM-eBus Sewa; growing private-operator participation.
- **Progress snapshot:** New awards to deploy **hundreds of e-buses** via consortia; Jaipur, Udaipur corridors earmarked for PCS.
- **Near-term focus:** Depot land & power tie-ups, driver skilling, and tourism-city charging.

### **Kerala**

- **Policy & instruments:** EV Policy emphasising **public-transport electrification** and concessional tariffs; KSEB as key enabler.
- **Progress snapshot:** **KSRTC-SWIFT has 160+ e-buses** in service; additional reallocations between city and inter-district routes tested service patterns.
- **Near-term focus:** Stabilise city frequencies, expand depots, and layer on **smart charging** to manage coastal-grid constraints.

### **Haryana**

- **Policy & instruments:** EV policy with **capital subsidies for first 400 PCS** (tiered by DC/AC), dedicated **charging tariff regulations** and building-code provisions for EV-ready parking.
- **Progress snapshot:** **Gurugram-Manesar** belt adding PCS at malls and tech parks; highway nodes on NH-48 filling gaps.
- **Near-term focus:** Faster municipal permitting and highway 50-km spacing adherence.

### **Jammu & Kashmir (UT)**

- **Policy & instruments:** City electrification under PM-eBus Sewa.
- **Progress snapshot:** **~200 e-buses allocated**; depot siting and cold-climate operations being planned.
- **Near-term focus:** Winter-ops playbooks (pre-conditioning, insulated packs), and grid-tie at depots.

### **Chandigarh (UT)**

- **Policy & instruments:** Early mover in city e-buses; alignment with PM-eBus Sewa.
- **Progress snapshot:** **~328 e-buses sanctioned**, targeting near-complete fleet electrification; PCS densification around ISBTs and sector hubs.
- **Near-term focus:** Scheduling, on-route top-ups, and integration with tricity feeder routes.

**Note:** Many other states--Andhra Pradesh, Odisha, West Bengal, Punjab--are refining policies around **EV-ready buildings**, **tariff rationalisation**, and **municipal parking/land access** to accelerate private investment in charging.

## **What's working--and what still needs fixing (stakeholder feedback)**

**State Transport Undertakings (STUs) & City Operators**

- *What's working:* OPEX-backed PPP for buses has **improved bankability**; depot electrification grants reduce upfront strain; standardised contracts are cutting tender cycles.
- *Pain points:* **Depot land** and power augmentation still delay go-live; need **battery-lease options** to mitigate long-term performance risks; winter/costal humidity operations require **thermal strategies** and pack warranties aligned to local conditions.

**Charge Point Operators (CPOs) & Real-Estate Hosts**

- *What's working:* PM E-DRIVE grants + **state VGF (e.g., Maharashtra)** improve project IRR; Delhi's **1 km grid coverage** vision provides demand certainty.
- *Pain points:* **Land access and permitting** remain the top bottlenecks; **demand charges** and transformer upgrades inflate OPEX/CAPEX; PPP tenders in some states saw **thin participation** outside top metros; need **minimum-uptime-linked payouts** and multi-year tariff visibility.

**OEMs, Tier-1s & Battery Firms**

- *What's working:* Clearer **AIS-156 battery safety** regime; **duty relief on critical minerals** and PLI continuity aid pricing and localisation; recognition of **e-trucks and ambulances** opens new demand pools.
- *Pain points:* **Certification queues** at labs; harmonisation of software/cybersecurity compliance across agencies; faster **test-cycle updates** for Indian duty cycles (ambient temps, gradients, payloads).

**Logistics & Fleet Operators**

- *What's working:* Emerging **TCO parity** in dense urban duty cycles; structured **incentives for e-trucks** improve pilot economics; bundling **charging + vehicles + maintenance** via single provider de-risks adoption.
- *Pain points:* **Payload hits** from battery mass in mid-haul; **highway charging for heavy vehicles** still sparse; need **multi-lane megawatt-scale hubs** and driver rest/amenities co-located with chargers; request for **toll/tax rationalisation** to offset early costs.

**Utilities & Regulators (DISCOMs, SERCs)**

- *What's working:* Dedicated **EV tariffs**, ToD (time-of-day) signals, and **open-access for charging** (e.g., AP) promote green energy linkage and load smoothing; depots justify **dedicated feeders**.
- *Pain points:* **Upstream capex** (33/11-kV upgrades) and right-of-way slow corridor nodes; need **standard SLAs** with CPOs for metering, telemetry, and settlements; harmonise **safety/earthing norms** at public sites.

**Financiers & Lessors**

- *What's working:* PM-eBus Sewa contracts and city-backed OPEX provide **bankable cash flows**; battery residual value improves with **recycling and second-life markets**.
- *Pain points:* Need **credit guarantees** or **first-loss cover** for SME operators; require **data transparency** (vehicle + charger) to underwrite uptime, energy consumption, and degradation; request **standard escrow structures** in municipal contracts.

**Citizens & Workforce**

- *What's working:* E-buses deliver quieter rides and better reliability; dense two-/three-wheeler electrification **cuts local pollution**; more **affordable charging** when ToD tariffs are passed through.
- *Pain points:* **Service consistency** during fleet reassignments; equitable access beyond CBDs; more **skilled technicians** needed for high-voltage maintenance; **consumer education** on safe home charging.

## **Practical playbook for states under PM E-DRIVE (2025-2027)**

1. **Plan buses as a service, not a purchase.** Standardise PPP concession templates; secure **10-year OPEX**; synchronise depot land and power **before** bus awards.
2. **Bundle charging with urban design.** Mandate EV-ready wiring in all new buildings; reserve kerbside PCS in commercial zones; deploy **1 km grid coverage** for metros.
3. **De-risk CPO investments.** Provide **VGF + site access MoUs**, predictable **ToD tariffs**, and **uptime-linked payouts**; allow **renewable PPAs/open access** for large hubs.
4. **Back heavy-vehicle corridors.** Identify freight spines; develop **megawatt-scale truck charging hubs** with parking, restrooms, food, and security.
5. **Go beyond incentives--enforce standards.** Adopt uniform **electrical safety and cybersecurity** specs; require **telemetry** from chargers and buses for transparency.
6. **Build talent pipelines.** Tie PM E-DRIVE projects to **ASDC/Skill India** modules for high-voltage safety, PCS O&M, and e-bus depot operations; embed **apprenticeships** in all new concessions.
7. **Measure what matters.** Track **uptime, cost/km, kWh/100 km, CO₂e/km**, and **customer satisfaction**; publish **open dashboards** to attract financiers and improve accountability.

## **What to expect next**

- **More city-clusters** (beyond the top 8 metros) will enter the **OPEX bus** pipeline as depots and feeders are financed.
- **Highway heavy-vehicle charging** nodes will begin to appear in 2026-27 as land banks are secured and grid upgrades complete.
- **State policies will converge** on: building-code mandates for EV-ready wiring, open-access renewables for large PCS, and standardised SLAs between utilities-CPOs-municipalities.
- **Data transparency** (telematics for buses, OCPI/OCPP for chargers) will become a precondition for incentives and financing.
- **Battery recycling and second-life** requirement

## **Maharashtra -- Annex **

**Policy excerpt** The state targets a dense, investment-friendly charging network with **viability gap funding (VGF) up to ~15% of capex** for fast chargers, **~25 km spacing on key highways**, and mandatory chargers at select MSRTC bus stations and oil-marketing outlets where feasible. Industrial clusters (Pune-Chakan, Aurangabad) are prioritized for depot and fleet charging.

**PCS status & targets.** Highway corridors (Mumbai-Pune-Nashik) are being densified; metro areas lead with multi-operator hubs at malls, offices, and depots. The near-term target is continuous fast-charging availability along the Golden Quadrilateral segments crossing the state and full coverage on Mumbai-Pune Expressway nodes.

**E-bus progress.** One of India's largest e-bus pipelines, with major allocations to BEST (Mumbai) and MSRTC intercity pilots; new depots funded for behind-the-meter power augmentation.

**12-month action items.**

- Fast-track land allotments at MSRTC stations and MIDC estates for CPOs.
- Bundle **ToD tariffs + open access RE** for large hubs to cut opex.
- Commission **truck-ready megawatt hubs** on freight corridors (JNPT-Pune-Nashik).
- Standardize concession templates with uptime-linked payouts and data transparency (OCPP/OCPI).

## **Delhi (NCT) -- Annex  **

**Policy excerpt   .** The updated EV Policy targets **>13,000 public charging points by 2030**, favors **1 km × 1 km urban coverage**, and mandates EV-ready building norms. Bus electrification is pursued via OPEX-backed contracts and dense on-route charging.

**PCS status & targets.** Thousands of public/semi-public points are live across municipal parking, DISCOM sites, and private locations; swapping hubs support delivery fleets. Target is **ward-level density** and curbside charging in mixed-use zones.

**E-bus progress.** A steadily expanding e-bus fleet with multi-depot electrification; short headways on trunk and feeder routes.

**12-month action items.**

- Convert **pilot curbside** sites into permanent concessions with service-level KPIs.
- Expand **EV-ready retrofits** in high-rise parking.
- Add **on-route top-up DC nodes** at major terminals.
- Integrate PCS uptime into **open dashboards** for citizen info and financing comfort.

## **Karnataka -- Annex  **

**Policy excerpt   .** BESCOM anchors an **urban-first, utility-enabled** charging model with PPP augmentation. The state supports e-buses for Bengaluru and is extending incentives to Tier-2/3 cities.

**PCS status & targets.** Bengaluru has one of the densest networks in India; state PPP tenders aim to add sites outside the capital. Utility-capex pilots will seed chargers where PPP interest is thin.

**E-bus progress.** City e-bus additions underway; depots upgraded for multi-MW connections.

**12-month action items.**

- Expand beyond Bengaluru with **utility-led capex (first 100 sites)** and then re-tender to private operators.
- Harmonize **demand charges** and speed up transformer upgrades.
- Co-locate **swapping + DC fast** at logistics belts (Peenya, Whitefield).
- Embed **apprenticeships** for HV safety and PCS O&M via ITIs.

## **Tamil Nadu -- Annex  **

**Policy excerpt   .** Six "EV Cities" (Chennai, Coimbatore, Tiruchirappalli, Madurai, Salem, Tirunelveli). Strong **manufacturing-first** policy (Hyundai, Ola, Ather) and city-cluster charging plans; export-oriented localization encouraged.

**PCS status & targets.** City corridors are being interconnected; PPP rounds add depot and public nodes; airports/ports targeted for high-availability charging.

**E-bus progress.** Rapid metropolitan deployments; new depots and smart-charging controllers commissioned.

**12-month action items.**

- Create a **city-cluster charging blueprint** with 1-2 km urban spacing.
- Anchor **OEM-supplier depots** with green power PPAs.
- Commission **bus+truck hybrid hubs** on Chennai-Bengaluru and Chennai-Madurai corridors.
- Open a **state PCS telemetry hub** for live performance tracking.

## **Gujarat -- Annex  **

**Policy excerpt   .** EV policy aligns with a **Green Energy Corridor** push; charging integrates with rooftop-solar leadership and industrial clusters.

**PCS status & targets.** Targets emphasize renewable-linked PCS on major corridors (Vadodara-Ahmedabad-Surat-Vapi) and city centers; industrial parks adopt fleet charging.

**E-bus progress.** City e-bus additions under PPP; depot readiness improving.

**12-month action items.**

- Prioritize **solar-linked highway PCS** with land along GEB substations.
- Adopt **one-stop utility-CPO approvals**.
- Expand **e-LCV depot networks** for textiles, diamonds, and ports.
- Codify **EV-ready buildings** in urban by-laws.

## **Uttar Pradesh -- Annex  **

**Policy excerpt   .** PCS subsidies explicitly **include upstream grid costs**, removing a key barrier for CPOs. Multi-city plan covers 16 urban centers.

**PCS status & targets.** A program to install **~320 PCS across 16 cities** is underway; Noida-Ghaziabad-Lucknow corridors are early movers.

**E-bus progress.** Allocations expanding across STUs; depots planned for major district HQs.

**12-month action items.**

- Package **land + grid + tariff** as a single MoU for CPOs.
- Install **truck-capable bays** on Delhi-Kanpur-Lucknow spine.
- Promote **battery swapping** for e-rickshaws and e-LCVs at metro/market hubs.
- Launch **city EV dashboards** tracking uptime and kWh/100 km for buses.

## **Telangana -- Annex  **

**Policy excerpt** Full **road-tax/registration waivers** for key EV segments; focus on **battery and energy-storage** industries and logistics hubs around Hyderabad.

**PCS status & targets.** ORR and logistics parks receive co-located **swapping + DC fast**; inner-city points add mixed AC/DC availability.

**E-bus progress.** Urban and airport routes prioritized; depots synchronized with DISCOM upgrades.

**12-month action items.**

- Establish **utility-CPO service-level agreements** for connections and metering.
- Enable **RE open access** for large PCS to lower tariffs.
- Plan **truck-ready hubs** near pharma and e-commerce clusters.
- Expand **skills programs** for high-voltage maintenance and charger O&M.

## **Rajasthan -- Annex**

**Policy excerpt   .** E-bus PPP route with multi-city awards; tourism corridors recognized for PCS siting.

**PCS status & targets.** Jaipur, Udaipur, Jodhpur growth nodes; highway nodes fill 50-80 km gaps.

**E-bus progress.** Hundreds of e-buses awarded to consortia; city depots under preparation.

**12-month action items.**

- Bundle **tourism-city charging** with parking concessions.
- Pre-tie **depot land and feeders** before bus awards.
- Pilot **on-route top-up** at intercity terminals.
- Set **EV-ready hotel** incentives (kerbside chargers, wayfinding).

## **Kerala -- Annex **

**Policy excerpt   .** Public-transport electrification priority; **concessional EV tariffs**; KSEB anchors grid upgrades.

**PCS status & targets.** Urban coastal belt nodes are growing; emphasis on smart chargers to manage local grid constraints and monsoon resilience.

**E-bus progress.** KSRTC-SWIFT runs **160+ e-buses**; route reassignments optimize utilization.

**12-month action items.**

- Roll out **smart-charging with demand response** at depots.
- Harden **weather-proof PCS** with elevated plinths and IP-rated gear.
- Train **coastal-ops technicians** in corrosion protection and HV safety.
- Add **tourism-route PCS** (Munnar, Kovalam, Wayanad).

## **Haryana -- Annex **

**Policy excerpt   .** Capital subsidy for the **first 400 PCS** (tiered by AC/DC), **special EV tariffs**, and EV-ready parking provisions in building codes.

**PCS status & targets.** Gurugram-Manesar belt expands with mall/office hubs; NH-48 nodes reduce gaps between Delhi and Jaipur.

**E-bus progress.** Allocations for city services with new depots near industrial belts.

**12-month action items.**

- Create a **single-window permission** portal for PCS.
- Formalize **uptime-linked payouts** in PPPs.
- Reserve **freight-oriented truck bays** in IMT Manesar/Jhajjar logistics parks.
- Mandate **EV-ready wiring** in large commercial and group housing.

## **Jammu & Kashmir (UT) -- Annex **

**Policy excerpt   .** City electrification prioritized under PM-eBus Sewa; seasonal operations and terrain constraints acknowledged.

**PCS status & targets.** Nodes planned for city centers and tourist belts; focus on winter-ready equipment and reliable supply.

**E-bus progress.** Allocation of **~200 e-buses**; depot siting and cold-climate SOPs under preparation.

**12-month action items.**

- Install **pre-conditioning systems** and insulated battery bays.
- Coordinate **depot feeders** with backup generation for winter peaks.
- Introduce **driver training** for snow/grade regimes in EVs.
- Provide **public info** on charger uptime and locations for tourists.

## **Chandigarh (UT) -- Annex**

**Policy excerpt   .** Early mover in e-buses; targets near-complete fleet electrification under OPEX model; sector-wise charging nodes.

**PCS status & targets.** Sector hubs (ISBTs, parking complexes) host multi-CPO sites; focus on reliable feeder capacity.

**E-bus progress.** About **328 e-buses sanctioned**; aim to electrify most city routes, coordinated with tricity feeder services (Mohali, Panchkula).

**12-month action items.**

- Expand **on-route top-up** chargers at terminal loops.
- Publish **real-time bus SoC & ETA** to improve reliability perception.
- Create **neighborhood PCS clusters** in sectors with high apartment density.
- Establish **skills labs** for HV diagnostics and battery safety with local ITIs.

### **FAQs:**

**1. What is the PM E-DRIVE Scheme in India?**
PM E-DRIVE (Electric Mobility Drive) is India's flagship EV adoption program launched in 2024 to accelerate electric mobility through demand incentives, charging infrastructure, and R&D support.

**2. When was PM E-DRIVE launched and how long will it run?**
The scheme was launched in late 2024 with an outlay of ₹10,900 crore and extended until March 2028 to support vehicle adoption, charging stations, and public transport electrification.

**3. What types of vehicles are covered under PM E-DRIVE?**
It includes e-2W, e-3W, e-LCVs, e-trucks, and e-ambulances, with e-buses supported under PM-eBus Sewa for city-level public transport.

**4. How does PM E-DRIVE support charging infrastructure?**
The scheme funds capital grants for public/semi-public charging stations, battery swapping points, highway corridor chargers, and depot electrification.

**5. What are the incentives under PM E-DRIVE for states and cities?**
States can access viability gap funding (VGF), OPEX support for e-buses, and grants for depot electrification, with eligibility linked to localization and standards compliance.

**6. How many charging stations will PM E-DRIVE deploy by 2028?**
The target is ~72,000 public charging stations, including nodes along highways, urban clusters, and depot infrastructure for buses.

**7. How is PM E-DRIVE different from FAME-II?**
Unlike FAME-II, which focused on demand-side subsidies, PM E-DRIVE adds heavy commercial vehicle electrification, charging corridors, interoperability standards, and lab modernization.

**8. Which states are leading in PM E-DRIVE implementation?**
Maharashtra, Delhi, Karnataka, Tamil Nadu, and Gujarat lead in charging deployment, e-bus sanctions, and manufacturing ecosystem development.

**9. What challenges do stakeholders face under PM E-DRIVE?**
Land access, grid upgrades, and standardization remain key pain points for charge point operators, STUs, and logistics players despite improved incentives.

**10. How does PM E-DRIVE align with India's EV30@30 goal?**
The scheme helps India target 30% of new vehicle sales as electric by 2030 through policy continuity, localized supply chains, and infrastructure expansion.