How EV charging works: AC vs DC
The grid supplies AC (alternating current). Batteries can only store DC (direct current). Every charging method is really about where that AC-to-DC conversion happens.
AC charging
The wall-mounted "charger" for an electric car is technically EVSE (electric vehicle supply equipment). It doesn't convert power. It checks that the car is connected safely, tells the car how much current it may draw, and switches the supply on. The actual conversion happens in the car's on-board charger (OBC). That's why a 22 kW AC point still charges a car with a 7.2 kW OBC at only 7.2 kW.
DC fast charging
A DC fast charger contains large power electronics that convert AC to DC and feed the battery directly. The car's BMS tells the charger how much power it can accept, moment by moment. DC charging is quick but costs more per kWh, and power drops off as the battery fills (see Chapter 4).
Scooters and e-rickshaws
Most electric two- and three-wheelers charge from a portable charger plugged into a normal 15/16 A socket. The charger is an AC-to-DC converter, and the vehicle's BMS controls the charge. Many brands also offer public DC fast charging through LEV connectors such as LECCS (Type 7) or Type 6.
EV charging levels and speeds in India
| Charging type | Typical power | Supply needed | Where | Example time |
|---|---|---|---|---|
| Scooter portable charger | 0.6–1.5 kW | 15/16 A socket | Home, office | 3 kWh scooter, 0–100%: ~3–6 h |
| LEV fast charging (LECCS / Type 6) | 3–12 kW DC | Commercial supply | Brand networks, malls, fuel stations | 0–80% scooter: ~30–60 min |
| Car portable / 15 A socket | ~3.3 kW AC | Dedicated 15/16 A circuit | Home, emergency use | 45 kWh car, 20–80%: ~9 h |
| AC wallbox (single-phase) | 7.2–7.4 kW AC | 32 A single-phase circuit | Home, office, societies | 45 kWh car, 20–80%: ~4 h |
| AC (three-phase) | 11–22 kW AC | Three-phase supply | Offices, malls, some homes | Limited by the car's on-board charger |
| DC fast | 25–60 kW | Commercial HT/LT supply | City charging hubs | 20–80%: ~35–75 min |
| DC high-power | 120–240 kW+ | Commercial HT supply | Highways, large hubs | Limited by the car's maximum DC rate |
Your vehicle sets the speed limitA charger can only deliver what the vehicle accepts. Check two numbers in your vehicle's specifications: the on-board charger rating (for AC, such as 3.3, 7.2 or 11 kW) and the maximum DC charging power (such as 30, 50 or 100 kW).
EV charging connectors in India: Type 2, CCS2, Bharat, LECCS and Type 6
India uses several connectors, but the picture is simpler than it looks: cars have mostly settled on Type 2 + CCS2, and two-wheelers on LECCS or Type 6.
| Connector | AC / DC | Typical power | Used by | Where you'll find it |
|---|---|---|---|---|
| 15/16 A 3-pin socket | AC | Up to ~3.3 kW | Scooter and e-rickshaw portable chargers; car portable chargers | Homes, offices, parking |
| Type 2 (IEC 62196-2) | AC | 3.3–22 kW | Most electric cars | Home wallboxes, offices, malls |
| CCS2 | DC (and AC via its Type 2 top) | 25–350 kW; most Indian DC points are 60–120 kW | Most electric cars sold today | City hubs and highway chargers |
| LECCS / Type 7 (IS 17017-2-7) | AC + DC in one connector | AC up to ~7.7 kW; DC up to ~12 kW | Ather, Hero Vida, Matter and others | Ather Grid and partner networks |
| Type 6 / LEV DC (IS 17017-2-6) | DC only | 3–12 kW | Ola, Ultraviolette, Simple and some three-wheelers | Brand and Bharat Charge Alliance networks |
| Bharat AC-001 | AC | 3 × 3.3 kW sockets | Early fleet cars, two- and three-wheelers | Older public charging points |
| Bharat DC-001 (GB/T-based) | DC | Up to ~15 kW | Early fleet EVs and some three-wheelers | Older public charging points |
| CHAdeMO | DC | Varies | Some older Japanese EVs | Largely phased out in India |
LECCS vs Type 6: what's the difference?
Both are Indian standards for light EVs, published by BIS under IS 17017. LECCS (Type 7), developed by Ather and open-sourced, puts AC and DC charging in one connector, so the same port works at home and at a fast charger. It was approved by BIS in October 2023, and by January 2026 networks using it had more than 5,000 public fast chargers. Type 6 (LEV DC) is a DC-only fast-charging connector based on the CHAdeMO light-vehicle design, promoted by the Bharat Charge Alliance. The two aren't plug-compatible, so check which one your scooter uses before relying on a public network.
Quick ruleElectric car? You almost certainly need Type 2 for home and office AC charging and CCS2 for fast charging. Electric scooter? Use your portable charger at home and your brand's fast-charging network on the road.
How long does it take to charge an EV?
The basic formula is simple, but two things make real charging slower: energy losses and the "taper" as the battery fills.
The formula
Charging time (h) ≈ battery kWh × (target % − start %) ÷ charging power (kW)
Then add roughly 10% for losses on AC, and expect the last 20% on a DC charger to take nearly as long as the 20–80% part.
Worked examples
| Vehicle | Charge | Charger | Approximate time |
|---|---|---|---|
| Scooter, 3 kWh | 20 → 100% | 750 W portable | ~3 h 45 min |
| Scooter, 3 kWh | 20 → 80% | 6 kW LEV DC | ~20–30 min |
| Car, 45 kWh, 7.2 kW OBC | 20 → 80% | 7.2 kW wallbox | ~4 h |
| Car, 45 kWh, 7.2 kW OBC | 20 → 80% | 3.3 kW portable | ~9 h |
| Car, 45 kWh, 60 kW max DC | 20 → 80% | 60 kW DC | ~35 min |
| Car, 45 kWh, 60 kW max DC | 80 → 100% | 60 kW DC | ~30 min more |
What slows charging down
- The vehicle's limits: its on-board charger (AC) and maximum DC rate.
- State of charge: above ~80%, the BMS cuts power to protect the cells.
- Temperature: a very hot or cold battery charges slower. Many cars precondition the battery before fast charging.
- Shared chargers: some DC stations split power between two vehicles.
- Supply voltage: low voltage at home, common at peak hours, reduces AC charging power.
Get the exact time and cost for your vehicle, charger and electricity rate.
Use the calculator ↓EV Charging Time & Cost Calculator
Choose your vehicle, charger and electricity rate to see charging time, cost per charge, cost per km and your monthly saving over petrol. Unlock the home-charger installation checklist to get the MCB, RCCB, cable size, sanctioned-load check and paperwork for your setup.
1. Your vehicle & charger
Typical home tariff: ₹6–9 per kWh. Check your electricity bill.
Vehicle limits, petrol comparison & home supply
Your sanctioned load and supply type are printed on your electricity bill. These are used in the installation checklist.
2. Your result
🔒 Get your home-charger installation checklist (free)
MCB and RCCB ratings, cable size, sanctioned-load check, earthing and location requirements, the paperwork for your DISCOM and society, and questions to ask your installer.
Estimates for planning only. Real charging time depends on battery temperature, charger sharing, supply voltage and your vehicle's charging curve. Electrical ratings in the checklist are typical starting points. A licensed electrician must size and install your circuit to the applicable Indian standards and DISCOM rules.
How to set up an EV charger at home in India
Home charging is the cheapest and most convenient way to charge. Done right, it's also safe.
Electric scooters and e-rickshaws
- Use a dedicated, earthed 15/16 A socket (not a 5/6 A socket) on a circuit protected by an MCB and RCCB.
- No extension boards or multi-plugs.
- Charge in an open or ventilated spot away from exits. See our EV fire safety guide for the full checklist.
Electric cars: the 6 steps
- Check your car's on-board charger. If it's 7.2 kW, a 7.2–7.4 kW wallbox gives full speed. A 3.3 kW OBC gains nothing from a bigger wallbox.
- Check your sanctioned load. A 7.2 kW charger adds about 7.2 kW of load. If your usual peak load plus the charger exceeds your sanctioned load, apply to your DISCOM for a load enhancement.
- Choose a location: your own parking spot, close to the meter or distribution board, protected from rain or with an outdoor-rated (IP54 or better) charger, and away from exits.
- Get approvals: in apartments, your society/RWA's permission for the cable route and meter connection. Some DISCOMs, such as those in Delhi, also offer a separate EV connection with its own tariff.
- Have a licensed electrician install a dedicated circuit: its own MCB, a suitable RCCB, correctly sized copper cable in conduit, and proper earthing.
- Test before first use: RCCB trip test, earth check and a supervised first charge.
Typical electrical requirements
| Charger | Current | Typical MCB | Typical copper cable* | Residual current protection |
|---|---|---|---|---|
| Scooter portable (≤1.5 kW) | ≤7 A | 16 A | 2.5 mm² | 30 mA RCCB |
| 3.3 kW (15 A socket) | ~14 A | 20 A | 2.5–4 mm² | 30 mA RCCB |
| 7.2 kW wallbox, single-phase | ~31 A | 40 A | 6 mm² (10 mm² for long runs) | 30 mA Type A with 6 mA DC detection, or Type B |
| 11 kW wallbox, three-phase | ~16 A per phase | 20 A, 4-pole | 4 mm², 4-core + earth | 30 mA 4-pole, Type A + DC detection or Type B |
| 22 kW wallbox, three-phase | ~32 A per phase | 40 A, 4-pole | 6–10 mm², 4-core + earth | 30 mA 4-pole, Type A + DC detection or Type B |
*Indicative only. The right size depends on cable run length, installation method and voltage drop. Many wallboxes have built-in DC leakage detection, in which case a standard Type A RCCB may be enough. Follow the charger manufacturer's manual and your electrician's design.
Earthing matters more than you thinkPoor earthing is one of the most common reasons home chargers refuse to start or trip repeatedly. Many charger makers ask for a dedicated earth pit and a low neutral-to-earth voltage, often under about 2 V. Ask your electrician to measure it.
Public EV charging in India: networks, rules and what's coming
- Setting up a charging station is de-licensed: anyone can set up and run one, under the Ministry of Power's 2024 guidelines for EV charging infrastructure.
- Density targets: the guidelines aim for a charging station every 1 km in cities and every 20 km along highways by 2030.
- Cheaper solar-hour power: charging stations get a single-part tariff, with lower rates during solar hours (9 am to 4 pm), and service charges are capped.
- PM E-DRIVE: ₹2,000 crore of the scheme's ₹10,900 crore budget is earmarked for public charging. By 22 July 2026, 6,562 public chargers had been sanctioned, but none had yet been installed, according to a government reply in Parliament.
- Two-wheeler networks are growing fastest: LECCS networks alone listed more than 5,000 public fast chargers by January 2026.
Public charging etiquette and tips
- Use the operator's app to check that a charger is working and free, and what it costs, before you drive there.
- Move your vehicle when charging finishes. Many operators charge idle fees.
- On highways, plan to stop at 15–20% and charge to about 80%. The last 20% is slow.
- Inspect the cable and connector before plugging in, and never use a damaged one.
What EV charging costs in India
| Where you charge | Typical price per kWh | Typical car cost per km |
|---|---|---|
| Home (domestic tariff) | ₹6–9 | ₹1–1.5 |
| Office or society AC | ₹8–15 | ₹1.3–2.5 |
| Public AC | ₹10–18 | ₹1.5–3 |
| Public DC fast | ₹18–30 | ₹3–5 |
| Petrol car, for comparison | – | ₹6–8 |
Public prices usually include 5% GST. Rates vary by state, operator and time of day.
How to cut your charging bill
- Charge at home whenever you can. It's usually a third of the cost of DC fast charging.
- Check for time-of-day or EV tariffs from your DISCOM, including separate EV connections where offered.
- Use DC fast charging for trips, not daily top-ups.
- Pair home charging with rooftop solar if you have it: charge during the day when your panels are producing.
Battery-friendly charging habits
- Daily charging: for NMC batteries (most scooters and many cars), staying roughly between 20% and 80–90% is gentlest. Charge to 100% before a long trip.
- LFP batteries are more tolerant of full charges, and many manufacturers recommend charging to 100% regularly so the battery gauge stays accurate.
- DC fast charging occasionally is fine. Relying on it every day, especially in Indian summer heat, can speed up battery ageing a little.
- Don't charge a hot battery. After a hard ride, let it cool for 20–30 minutes.
- Use scheduled charging in your app so charging finishes just before you leave.
- Long storage: leave the battery at 40–60% and top it up monthly.
Careers in EV charging
Every charger installed needs people to design, install, run and repair it, from electricians to software engineers.
EVSE installation technician
Site surveys, wiring, earthing, commissioning and testing home and commercial chargers. Ideal for electricians and ITI holders.
Charging station O&M engineer
Keeps public chargers running: diagnostics, preventive maintenance, uptime.
Charger hardware / power electronics engineer
Designs AC wallboxes and DC fast chargers: converters, protection and thermal design.
Charging software & OCPP engineer
Builds the apps, payments and backend systems that connect chargers to networks using protocols such as OCPP.
Charge point network planner
Chooses sites, sizes grid connections and plans rollouts for operators and fleets.
Fleet charging manager
Runs charging depots for delivery, bus and taxi fleets, scheduling and controlling energy costs.